Grid Intelligence Software

Assess Grid Capacity

We help you find and secure a viable grid connection - without having to wait months for a response from the DNO.

Book a Demo

We'll help you assess one of your sites for free!

Power Flow Analysis
We're building a network model of the entire UK energy system and running power flow analysis across it.
Full Network Coverage
We map the entire network across all DNOs, tracking every transformer, circuit and bus from 11kV up to the GSP.
Always Up To Date
Your results are constantly updated because we continuously sync with the latest network data.

Ignoring grid upfront is a recipe for disaster

Proximity to network is quickly becoming the most important factor when selecting a site but is always left until the last minute - then stops a project in its tracks.

Applying for grid and hoping for the best
Applying for grid and waiting for the DNO to respond is slow, expensive and ineffective. A DNO isn't allowed to advise on the best location for your connection so it's impossible to find the optimal site.
Checking headroom on DNO heatmaps
It's so much more complicated then simply checking substation headroom on a DNO heatmap. If you don't consider cables, transformers, buses and the complicated relationship between them then it's just a shot in the dark.

Who we serve

Data Centres

Compare sites by realistic time to power, available MW and reinforcement risk, so you can secure grid-ready locations faster and with confidence.

EV Charging

Prioritise hubs where power is realistic, size connections to the charging plan, and avoid spending months on locations that will not have capacity.

Renewables

Screen sites for credible connection timelines and local network constraints, so you can focus on projects with a viable path to energisation.

Real Estate

Plan electrification and expansion by checking capacity at your facilities, estimating connection timelines, and de-risking investment decisions.

Don't just take our word for it

Yottar transformed our site selection process. It allowed us to quickly identify locations with real potential and avoid wasting time on sites that would never get a viable grid connection.
Hamza Latif
Grid Connections Manager
Tesla
Yottar offers me an unrivalled strategic view of the electrical supply availability. It has been an invaluable in helping NHS England plan the EV charging infrastructure to support the zero emission ambulance fleet of the future.
Paul Chandler
Transport Deputy Director
NHS England
For an estate as large and complex as ours, grid capacity is one of the biggest bottlenecks to our decarbonisation plans. The platform that Yottar provides is essential to us achieving net zero.
Nick Macdonald Smith
Net Zero Carbon Lead
NHS Property Services

How it works

Step 1

Enter your requirements

  • Filter infrastructure based on required capacity
  • Define a maximum search distance
  • Set a date for when you need the power by.
Step 2

Find a location

  • Review potential POCs based on your requirements
  • Quickly measure the distance to the nearest cable
  • Switch between different map views
Step 3

Plan cable route

  • Compare connection potential at different voltages
  • Check for obstacles like roads, railway lines or waterways
  • Simulate a realistic cable trench with our auto-route finder
Step 4

Assess capacity

  • See how much capacity is available today
  • Check what reinforcements are triggered
  • Find out which network reinforcements are planned
Step 5

Apply for a connection

  • Select the best point of connection
  • Fine tune your capacity to minimise reinforecements
  • Export from Yottar and upload to the DNO portal

Want to learn more?

Book a Demo

We'll help you assess one of your sites for free!

As seen on

Arise Health logoThe Paak logoOE logo2020INC logo